Another weekend of errands, packing, and keeping an eye on the basement whenever it rained.  There was a fair bit of rain, but there weren't that many major issues with the basement.  Sure would be nice if we got a bit more dry weather, though.  The saving grace is the workweeks have been relatively dry during working hours.

I didn't do the usual photo processing tonight, so the images may look a bit dark, etc.

Here is the current state of affairs with the roof construction, as seen from ground level.

Jane climbed up and got some pictures.  I stitched a few of these into panoramic shots, which explains the irregular cropping and perspective on he last two shots.


The roof overhang around Maddy's room (white tarp) has been removed.  Also, some of the roof overhang near the bathroom (blue wavy curtain) has also been removed.


Panoramic shot of the bedroom closet, and the area where the ensuite bathroom will be constructed.


Another panoramic shot...the loft space, south window, and the main area of the bedroom.  The doorway to the balcony has not yet been moved to the west wall.