OK, so now we have wall all the way around the addition, and the sill plate for the second floor framing has been installed. The first floor is now wrapped in Tyvek-ish material as well.
And today the remaining windows were ordered. That's a big one out of the way.
The bottom section of the Big South Window is enclosed.
looking from the food prep area towards the loft space and the new entrance.
the view from the driveway.
Getting ready for installation: Floor joists and LVL beams for the second floor
No comments:
Post a Comment