The house was busy today with plumbers and electricians getting last-minute changes done before the drywall crew starts work.
The water supply lines for the main sink and the coffee maker have been run, and also the drain line for the coffee maker has (finally) been run. The plumbing for the kitchen island has been removed because it really needs to be located once the island is here in the house. This plumbing will be located mainly over the workshop, so it is still possible to do it after the downstairs bedroom ceiling has been finished with drywall.
In the laundry room, our old electrical panel is gone, and we have some of the old circuits moved over to the new panel.
framing around the window in the laundry room
drywall, ready to go, in the basement
and in the bedroom
Looking at colour ideas for the upper kitchen cabinets, which will be painted. Just a small sampling of the various paint chips floating around the house at the moment.






No comments:
Post a Comment