Lots of work both inside and out today.

The angled "fins" that come down on each side of the south window have been framed and wrapped with Tyvek.  There is additional framing still to be done relating to the roof overhang on both the south and north sides.

This is the new double-hung window to go on the existing house where Jane's studio will be.  The basement windows for the addition also arrived today.

Demolition work in the old second-storey bathroom.

The upper cabinets have been removed from the kitchen walls.

We have a dumpster in the driveway instead of a pile of building materials.