Ren-Oh: Let it rain (pt. 2)

Sunday, June 28, 2009

Let it rain (pt. 2)

Some pics of the storm sewer work after it is “done”.


concrete repairs in the workshop where the sump pit used to be.  Over on the right you can see the sump pump, now disconnected.


The clay soil has been spread over the yard.  We’ll be looking at getting some simple landscaping done over the next few weeks.


The temporary steps have been temporarily re-attached.


The driveway needs to be re-paved.  Also, there is a section of the concrete sidewalk that was patched with asphalt, that will need to be re-done with concrete.

No comments:

Post a Comment