Ren-Oh: Concrete Progress

Sunday, November 1, 2009

Concrete Progress

One of those (now) rare, blog posts about the renovation.

Back when the storm sewer connection was installed, the driveway and part of the city sidewalk were ripped up.  Before we can get the driveway re-paved, we needed to get the city sidewalk repaired.  That happened last week.


on the left is existing sidewalk, on the right is the temporary patch.


one other slab of sidewalk was badly cracked during the sewer installation, and would also be replaced.


all done.

Next up will be getting the driveway re-paved.  We don’t have a firm date lined up for this, but I’m hoping for this week.